Client Overview

D***** Inc. is a leading utility line construction contractor serving the western United States. Their commitment to operational efficiency and customer satisfaction drives their need for advanced digital solutions.

Industry: Utility Line Construction

Client Since: November 2020

Source: Inbound Referral

The Challenge

Before implementing the new solution, D***** Inc. faced several operational inefficiencies:

  • Limited Technical Features: Their existing system lacked the necessary tools for seamless scheduling and equipment tracking.
  • Disorganized Data Structure: The lack of a proper data framework led to inconsistencies and inefficiencies.
  • No Automations: Manual processes slowed down workflows, reducing productivity and increasing errors.

These challenges led to frustration among employees and management, highlighting the urgent need for an upgraded system.

How They Found & Chose the Solution

Internal referral.

The district manager and office manager were introduced to the solution through an internal referral. An employee who had previously struggled with the existing system recommended reaching out for a better alternative.

After a demonstration, the management team saw the potential for:

  • Advanced Scheduling Features tailored to their construction needs.
  • Automated Equipment Request Tracking to streamline workflows.
  • ROI Reporting that provided financial insights into scheduled jobs.

The combination of powerful features and a user-friendly interface made the decision clear – D***** Inc. chose to move forward with the implementation.

Implementation & Adoption

The process began with an in-depth scoping phase, working closely with the D***** Inc. team to identify their exact needs.

After analysis and development, a customized solution was delivered.

Training sessions were conducted for managers and owners, ensuring smooth adoption.

Once leadership was trained, the rest of the team transitioned seamlessly to the new system, improving efficiency with minimal disruption.

Key Measurable Results

The new system led to significant time savings, directly reducing labor costs.

Improved data accuracy resulted in better customer service, reducing errors in scheduling and reporting.

Additionally, construction schedulers experienced a more streamlined workflow, leading to higher job satisfaction.

Most Loved Features & Benefits

Financial WIP (Work in Progress) Reporting

Real-time financial tracking.

Future Job ROI Estimates

Support data-driven decision-making.

A Cleaner Data Structure

Improved overall system usability and efficiency.

Customer Feedback & Testimonials

“Thank you for your help!!”

Importance of investing in the right technology

By implementing an advanced scheduling and financial tracking system, D***** Inc. successfully overcame operational inefficiencies, improved accuracy, and increased team satisfaction.

Contact us to get started today.